# Flood tests before waterproofing is covered

Source: https://roofingbyskyline.com/blog/flood-testing-waterproofing

> Once tile, pavers or soil go down, a membrane defect is expensive to find. How ASTM D5957 flood testing and ASTM D7877 electronic leak detection work.

Published 2026-10-11 · Waterproofing

A waterproofing membrane can look perfect and still have a pinhole at a drain, an unbonded lap or a nick from a dropped tool. On an exposed roof, you’d find that at the first storm and fix it in an afternoon. Under a paver deck, a planter or a tiled balcony, you’d find it as a stain on the ceiling below — and fixing it means tearing out everything on top.

That’s why we test horizontal waterproofing over occupied space **before** it’s covered.

## Flood testing (ASTM D5957)

ASTM D5957 is the industry’s _Standard Guide for Flood Testing Horizontal Waterproofing Installations_. The idea is simple: dam the area, flood it with water, wait, and look underneath.

**How it works on our projects:**

1. **Plan the test with the structure in mind.** Water is heavy — about 5.2 pounds per square foot for every inch of depth — so dam heights are kept modest and large areas are tested in sections.
2. **Dam and plug.** Temporary dams go around the test area; drains are plugged or sleeved so the water level holds.
3. **Flood and mark.** Water is added to the specified depth and the level is marked so any drop is obvious.
4. **Wait and watch.** The water stays in place for the duration the specification calls for — commonly 24 hours or longer — while someone checks the space below.
5. **Drain, document, cover.** If it passes, we photograph the result and install protection or the next layer promptly, before other trades walk on it.

**Where it fits:** D5957 is intended for horizontal waterproofing with very little slope — plaza decks, podiums, planters, balconies and similar areas. It is **not** intended as a test for roofing systems, and steeply sloped areas are hard to flood without many small dams.

## Electronic leak detection (ASTM D7877)

ASTM D7877 covers electronic methods for detecting and locating leaks in roofing and waterproofing membranes. Most membranes are electrical insulators; the structural deck beneath is conductive. Technicians apply a low-voltage charge across the membrane and trace where current finds a path through it — which pinpoints the breach.

**Strengths:**

- Locates the exact spot of a defect instead of just proving that one exists
- Works on sloped surfaces and on roofs, where flooding isn’t practical
- No heavy water loads on the structure
- Some methods can be used after certain overburdens are in place

**Limits:** The method needs a conductive layer beneath the membrane. Concrete usually provides it; wood decks may need a conductive layer planned into the assembly from the start. That’s a design decision, so we raise it early.

> **Our rule:** If a horizontal membrane is going to be buried under tile, pavers, a topping slab or soil, it gets tested before it disappears — by flood test or electronic leak detection, whichever suits the assembly.

## Testing is part of a system, not a substitute for one

Testing catches defects; it doesn’t prevent them. The membrane still needs a sound, dry substrate, slope to drain, details flashed first and verified thickness. Testing is simply the final proof that all of that was done right — and the record you keep in your building file.

**Diagram — Protected membrane under plaza overburden** (layers from the substrate up):

1. Structural concrete slab — Cured, repaired and profiled to spec
2. Primer — Where the membrane system requires it
3. Reinforced waterproofing membrane — Hot-applied or fleece-reinforced liquid
4. Protection course — Shields it from follow-on trades
5. Drainage composite — Carries water to the drains
6. Insulation (where specified) — Rigid board, protected assemblies
7. Pavers, planters or green roof — The overburden, drained below

## What to ask your contractor

- Will the membrane be tested before it’s covered? By what method?
- Who watches the space below during a flood test, and for how long?
- Will I get photos and a written record of the result?
- If the deck is wood-framed and electronic testing is planned, how will the conductive layer be provided?

Planning a podium, roof deck or tiled balcony? [Talk to us early](https://roofingbyskyline.com/contact) — testing is easiest when it’s designed in.

## Contact

- Phone: (415) 209-5199 (+1-415-209-5199)
- Email: info@roofingbyskyline.com
- Hours: Monday–Friday, 8am–5pm
- Service area: San Francisco and the greater Bay Area — San Francisco, The Peninsula, The East Bay, The South Bay, Marin
- License: California C-39 Roofing, CSLB #1138836 (verify: https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx)
- Request a free assessment: https://roofingbyskyline.com/contact