When we open up a leaking deck, the membrane in the middle is almost always fine. The water got in at a **detail** — a place where the deck meets something else. Coatings are good at covering flat plywood. They can’t make up for a detail that was never built right.

These are the seven places we look first.

## 1. The door threshold

The most common leak we find. Water collects against the door, runs under the threshold and into the wall or floor below. The fix is a **pan flashing** under the threshold that’s integrated with the deck membrane, with the membrane turned up behind it — and enough height between the deck surface and the door sill that standing water can’t reach it. Caulk along the bottom of a door is not a pan.

## 2. The wall-to-deck transition

Where the deck meets the wall, the membrane has to turn up the wall and lap _behind_ the building’s weather-resistive barrier, so water running down the wall lands on top of the membrane, not behind it. When stucco or siding is installed tight to the deck surface, that lap is often missing — and there’s no way to see it without opening the wall.

## 3. Drains and scuppers

A drain is a hole in the waterproofing on purpose. The membrane has to be clamped or flashed into the drain body, and the drain has to sit at the low point. Drains set high leave a ring of standing water; drains that aren’t integrated let water travel along the outside of the pipe.

## 4. Railing posts and penetrations

Every post bolted through the deck surface is a penetration. Through-deck posts need sleeves or flashings integrated with the membrane, and they need to be re-sealed when railings get replaced. Where possible, we prefer side-mounted or fascia-mounted railings that keep fasteners out of the walking surface altogether.

## 5. Edges and drip metal

At the outer edge, the membrane should lap onto drip edge metal that’s been primed and set before coating, so water sheds clear of the framing below. An edge where the coating simply stops on bare plywood will wick water into the end grain.

## 6. Plywood joints and cracks

Plywood moves with temperature and moisture. Joints that aren’t reinforced before coating telegraph through the membrane as cracks — first cosmetic, then not. Reinforcing joints and transitions is a small step that prevents a large share of deck failures.

**Diagram — Pedestrian deck coating over plywood** (layers from the substrate up):

1. Plywood deck, sloped to drain — Re-fastened; slope corrected first
2. Sheet-metal flashings — Door pans, edge and wall metal set first
3. Joint & detail reinforcement — Joints, cracks and transitions
4. Primer — Matched to the substrate
5. Elastomeric base coat — The membrane, built to spec mils
6. Wear coat + broadcast aggregate — Slip resistance and abrasion protection
7. UV-stable top coat — Color finish that seals the aggregate

## 7. Slope and ponding

A deck that holds water keeps every other detail wet for days after each rain. We build slope back in — at least 1/4" per foot wherever the structure allows — before coating. Extra coating is not a substitute for drainage.

## And underneath it all: thickness

A membrane applied too thin will fail early everywhere, not just at the details. Manufacturers specify thickness for each coat; we measure it with a wet-film gauge as we go, and track material use against the coverage rate.

> **Field note:** If your deck has been “recoated” more than once and still leaks, the coating probably isn’t the problem. One of the details above is. A [controlled water test](https://roofingbyskyline.com/waterproofing/leak-investigation) will usually show which one.

Our full list of practices is in the [Skyline Waterproofing Standard](https://roofingbyskyline.com/waterproofing/best-practices). If you’d like us to look at your deck or balcony, [request an assessment](https://roofingbyskyline.com/contact).

## Contact

- Phone: (415) 209-5199 (+1-415-209-5199)
- Email: info@roofingbyskyline.com
- Hours: Monday–Friday, 8am–5pm
- Service area: San Francisco and the greater Bay Area — San Francisco, The Peninsula, The East Bay, The South Bay, Marin
- License: California C-39 Roofing, CSLB #1138836 (verify: https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx)
- Request a free assessment: https://roofingbyskyline.com/contact