# The Skyline Waterproofing Standard

Source: https://roofingbyskyline.com/waterproofing/best-practices

> The written best practices Skyline follows on every waterproofing project.

## 1. Before we install

Most waterproofing failures are decided before the first coat: by the substrate, the slope and the details.

- **Diagnose before we prescribe.** We find out why water is getting in and what the substrate is really like — cores, moisture readings, opened-up details — before recommending a system.
- **Specify the system to the substrate.** Plywood over living space, a concrete podium and an old built-up roof need different membranes. We choose the manufacturer system built for that substrate, exposure and finish.
- **Slope to drain — 1/4" per foot wherever possible.** Waterproofing isn’t a substitute for drainage. We build decks and low-slope roofs to at least 1/4" per foot wherever the structure allows, correcting slope with framing, tapered insulation or sloped fill before coating.
- **Test moisture and adhesion.** Membranes fail when they’re applied to wet or weak surfaces. We test concrete moisture and run pull-off or field adhesion tests before committing to a primer and system. (Reference: ASTM F2170 · ASTM D4263 · ASTM D7234)
- **Prepare the surface to spec.** Concrete gets the surface profile the manufacturer calls for; plywood gets re-fastened and smoothed; old roofs get cleaned, dried and repaired. (Reference: ICRI 310.2R surface profiles)

## 2. While we install

A membrane is only as good as its thinnest spot and its worst detail.

- **Details first, field second.** Door thresholds, drains, posts, parapets, penetrations and wall transitions are flashed and reinforced before the field membrane goes down.
- **Complete manufacturer systems only.** Primer, membrane, reinforcement and top coat all come from one tested system. Mixing brands voids warranties and invites compatibility failures.
- **Measured thickness on every coat.** We measure wet-film thickness as we go and track material consumption against coverage rates, so every square foot meets the specified mils. (Reference: ASTM D4414 wet-film gauges)
- **Respect cure and weather windows.** Temperature, humidity, dew point and recoat windows are on the data sheet for a reason. We schedule around them rather than racing the weather.
- **Flashings go under, not on top.** Sheet metal and membranes are lapped so water always runs over a seam, never into it. Sealant is a backup, never the primary defense.

## 3. Before we call it done

We prove the system works and leave you with the records to keep it working.

- **Test before it’s covered.** Horizontal membranes over occupied space are flood-tested or electronically tested before tile, pavers, soil or wearing surfaces cover them. (Reference: ASTM D5957 · ASTM D7877)
- **Document everything.** Photos of every detail, thickness readings, test results and product batch information go into a closeout package for your records and warranty file.
- **Register the warranty.** Where the manufacturer offers one, we register the warranty and hand you the paperwork — on top of our own written workmanship warranty.
- **Plan the maintenance.** Every system gets a simple maintenance plan: what to clean, what to check, and when a re-top-coat will extend its life.

## Contact

- Phone: (415) 209-5199 (+1-415-209-5199)
- Email: info@roofingbyskyline.com
- Hours: Monday–Friday, 8am–5pm
- Service area: San Francisco and the greater Bay Area — San Francisco, The Peninsula, The East Bay, The South Bay, Marin
- License: California C-39 Roofing, CSLB #1138836 (verify: https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx)
- Request a free assessment: https://roofingbyskyline.com/contact
