The Skyline Waterproofing Standard

How waterproofing should be done.

Premium products fail when they’re applied to wet substrates, built too thin, or left unflashed at a door threshold. This is the written standard our crews follow on every waterproofing project — so you know exactly what you’re paying for.

It applies whether the system is a GacoFlex deck coating, a Kemper System fleece-reinforced membrane or another manufacturer’s specified system.

Phase 01

Before we install

Most waterproofing failures are decided before the first coat: by the substrate, the slope and the details.

  1. 01

    Diagnose before we prescribe

    We find out why water is getting in and what the substrate is really like — cores, moisture readings, opened-up details — before recommending a system.

  2. 02

    Specify the system to the substrate

    Plywood over living space, a concrete podium and an old built-up roof need different membranes. We choose the manufacturer system built for that substrate, exposure and finish.

  3. 03

    Slope to drain — 1/4" per foot wherever possible

    Waterproofing isn’t a substitute for drainage. We build decks and low-slope roofs to at least 1/4" per foot wherever the structure allows, correcting slope with framing, tapered insulation or sloped fill before coating.

  4. 04

    Test moisture and adhesion

    Membranes fail when they’re applied to wet or weak surfaces. We test concrete moisture and run pull-off or field adhesion tests before committing to a primer and system.

    Reference: ASTM F2170 · ASTM D4263 · ASTM D7234

  5. 05

    Prepare the surface to spec

    Concrete gets the surface profile the manufacturer calls for; plywood gets re-fastened and smoothed; old roofs get cleaned, dried and repaired.

    Reference: ICRI 310.2R surface profiles

Phase 02

While we install

A membrane is only as good as its thinnest spot and its worst detail.

  1. 06

    Details first, field second

    Door thresholds, drains, posts, parapets, penetrations and wall transitions are flashed and reinforced before the field membrane goes down.

  2. 07

    Complete manufacturer systems only

    Primer, membrane, reinforcement and top coat all come from one tested system. Mixing brands voids warranties and invites compatibility failures.

  3. 08

    Measured thickness on every coat

    We measure wet-film thickness as we go and track material consumption against coverage rates, so every square foot meets the specified mils.

    Reference: ASTM D4414 wet-film gauges

  4. 09

    Respect cure and weather windows

    Temperature, humidity, dew point and recoat windows are on the data sheet for a reason. We schedule around them rather than racing the weather.

  5. 10

    Flashings go under, not on top

    Sheet metal and membranes are lapped so water always runs over a seam, never into it. Sealant is a backup, never the primary defense.

Phase 03

Before we call it done

We prove the system works and leave you with the records to keep it working.

  1. 11

    Test before it’s covered

    Horizontal membranes over occupied space are flood-tested or electronically tested before tile, pavers, soil or wearing surfaces cover them.

    Reference: ASTM D5957 · ASTM D7877

  2. 12

    Document everything

    Photos of every detail, thickness readings, test results and product batch information go into a closeout package for your records and warranty file.

  3. 13

    Register the warranty

    Where the manufacturer offers one, we register the warranty and hand you the paperwork — on top of our own written workmanship warranty.

  4. 14

    Plan the maintenance

    Every system gets a simple maintenance plan: what to clean, what to check, and when a re-top-coat will extend its life.