Skip to content
Waterproofing · Parking & vehicular

Parking deck & garage traffic coatings

Water, oil and tire traffic work their way into concrete parking decks, corroding reinforcing steel and dripping onto cars and spaces below. A traffic coating seals the slab with an elastomeric membrane and an aggregate-loaded wear course built for vehicles.

We prepare the concrete properly — profile, cracks and joints first — then install the full manufacturer system with heavier wear courses where cars turn and brake.

Vehicular traffic coating

Vehicular traffic coating: 1. Structural concrete deck, 2. Cracks & joints treated, 3. Primer, 4. Elastomeric base membrane, 5. Wear course + aggregate, 6. Top coat
Ideal for
  • Open parking decks and ramps
  • Podium garages under residential
  • Driveways over occupied space
  • Loading areas over occupied space
Why it works

Built to stay watertight, not just look finished.

Protects the structure

Keeping water and chlorides out of the slab helps protect reinforcing steel from corrosion.

Stops drips below

An elastomeric membrane bridges hairline cracks that let water through to cars, storage or retail below.

Built for tires

Aggregate-loaded wear courses are heavier in drive aisles, ramps and turning areas.

Phased for operations

We sequence work by bay or level so the garage can stay partially in service.

The system

Vehicular traffic coating

An elastomeric membrane with an aggregate-loaded wear course, built for tire traffic, turning and the de-icing and oil exposure of a working garage.

Layer by layer, from the substrate up

  1. 01Structural concrete deckShot-blasted to the specified profile
  2. 02Cracks & joints treatedRouted, sealed and pre-striped
  3. 03PrimerFor adhesion and outgassing control
  4. 04Elastomeric base membraneWaterproofs and bridges hairline cracks
  5. 05Wear course + aggregateHeavier in drive aisles and turns
  6. 06Top coatLocks in aggregate; UV resistant
How we do it

Our process

  1. 01

    Survey the slab

    Map cracks, joints, spalls and drainage problems, and test moisture and existing coatings.

  2. 02

    Profile and repair

    Shot-blast to the specified surface profile, rout and seal cracks, and treat joints.

  3. 03

    Install the system

    Primer, base membrane, wear course with aggregate and top coat — thickness checked at each step.

  4. 04

    Stripe and return

    Cure, re-stripe and reopen in phases, with documentation for your maintenance records.

Our standard

What we check on every job

  • Concrete surface profile verified against the manufacturer’s requirement
  • Pull-off adhesion test areas before full application
  • Cracks and joints treated before the membrane, not after
  • Wear course thickness increased in drive aisles and turns
Read the full waterproofing standard
FAQ

Parking decks & garages: questions & answers

Straight answers from the people who do the work.

How long does a parking deck have to be closed?

It depends on the system and area. Fast-curing systems can shorten downtime considerably. We phase the work so most of the garage stays usable.

Do you repair the concrete too?

We handle routine crack and joint preparation as part of the coating. Structural concrete repairs are coordinated with the appropriate engineer and contractor.

Free assessment

Let’s keep the water out — for good.

Tell us what’s going on. We’ll inspect, explain what we find with photos, and give you a written, fixed-price proposal — usually within 48 hours of the visit.