Below-grade & foundation waterproofing
Hillside lots, high groundwater and lower-level living spaces make below-grade waterproofing a big deal in the Bay Area. Once the wall is backfilled, the only chance to do it right is the one before.
We waterproof on the positive (soil) side wherever access allows, with a continuous membrane, protection board and a drainage path that relieves water pressure instead of fighting it.
Positive-side foundation waterproofing
- New foundations and additions
- Retaining walls
- Basement and garage walls
- Lower-level remodels (excavated walls)
- Elevator pits and below-grade utility spaces
Built to stay watertight, not just look finished.
Stops water at the source
Positive-side membranes keep water out of the concrete entirely, protecting the wall and its reinforcing steel.
Drainage relieves pressure
A drainage composite carries water down to the footing drain so it can’t build up against the wall.
Details done in system
Footing transitions, inside and outside corners, tie holes and pipe penetrations are reinforced with the membrane system.
Inspected before backfill
We walk the wall with you or your builder and document every section before it disappears.
Positive-side foundation waterproofing
A continuous membrane on the soil side of the wall, protected and drained, so groundwater never reaches the concrete in the first place.
Layer by layer, from the substrate up
- 01Foundation wallTie holes and cracks repaired
- 02PrimerWhere the membrane requires it
- 03Waterproofing membraneFluid-applied or self-adhered sheet
- 04Detail reinforcementFootings, corners and penetrations
- 05Protection boardGuards the membrane during backfill
- 06Drainage compositeRelieves pressure to the footing drain
Our process
01
Prepare the concrete
Fill tie holes, repair honeycombing and cracks, and let the wall reach the dryness the membrane requires.
02
Reinforce details
Footing transitions, corners and penetrations are reinforced before the field membrane goes on.
03
Install membrane & drainage
Membrane to specified thickness, then protection board and drainage composite tied into the footing drain.
04
Document and hand off
Photo record and thickness readings before backfill, so there’s proof of what’s behind the dirt.
What we check on every job
- Concrete cured and dry enough for the specified membrane
- Continuous membrane with no unreinforced transitions
- Protection board installed before backfill — every time
- Drainage connected to a working outlet, not just placed against the wall
Below-grade & foundations: questions & answers
Straight answers from the people who do the work.
Can you waterproof a basement from the inside?
Interior (negative-side) treatments can manage dampness, but they don’t stop water from reaching the concrete. Where excavation is possible, positive-side waterproofing is the durable fix. We’ll explain the trade-offs for your site.
Do I need drainage if I have a membrane?
Yes. Membranes keep water out; drainage keeps pressure off. The two work as a system.
Read before you decide
Waterproofing · 3 min read
SB 721 and SB 326 balcony laws for Bay Area owners
Both first-round balcony inspection deadlines have passed. What SB 721 (apartments) and SB 326 (condos and HOAs) require, and how waterproofing fits the repair.
Waterproofing · 3 min read
Deck coatings compared
Three families of walkable waterproofing cover Bay Area decks and balconies: how each is built, where it shines, and what to ask before you choose.
Waterproofing · 2 min read
Flood tests before waterproofing is covered
Once tile, pavers or soil go down, a membrane defect is expensive to find. How ASTM D5957 flood testing and ASTM D7877 electronic leak detection work.
Let’s keep the water out — for good.
Tell us what’s going on. We’ll inspect, explain what we find with photos, and give you a written, fixed-price proposal — usually within 48 hours of the visit.