Roof replacement
When a roof is truly done, you deserve a contractor who will tell you what’s wrong, what it costs and how long it takes — without upselling or scare tactics.
Every Skyline replacement is a full tear-off to the deck with structural repairs as needed, a complete manufacturer system installed to spec, a city permit and inspection, and our written 10-year workmanship warranty.

- Roofs at the end of their service life
- Homes being sold or renovated
- Roofs with widespread leaks
- Upgrades to metal, tile or cool roofs
Done right the first time — and built to last.
Fixed written price
Detailed scope, materials and timeline in writing within 48 hours of inspection.
Complete systems
Underlayment, flashings, ventilation and roofing from one manufacturer system.
Permitted and inspected
We pull the permit and schedule the city inspection.
10-year workmanship warranty
Covers labor, flashing and installation defects, on top of manufacturer material warranties.
Architectural shingle roof system
A complete manufacturer system — not just shingles. Every layer is installed to the manufacturer’s instructions so the warranty means something.
Architectural shingle roof system
Layer by layer, from the substrate up
- 01Roof deckRe-nailed; damaged sheathing replaced
- 02Self-adhered membraneValleys, eaves and around penetrations
- 03Synthetic underlaymentSecondary water barrier over the deck
- 04Drip edge & metal flashingsEaves, rakes, walls and chimneys
- 05Architectural shinglesClass A, fastened to manufacturer spec
Our process
01
Free inspection
30–45 minutes on the roof and in the attic, with photos of everything we find.
02
Written estimate
Fixed price, detailed scope and options within 48 hours.
03
Selection and permits
Choose colors and products; we pull the permit and schedule your start date.
04
Install and walkthrough
Most homes take 1–3 days of active work, then cleanup and a final walkthrough.
What we check on every job
- Full tear-off to the deck
- Per-sheet sheathing price agreed before work starts
- All-new flashings and ventilation components
- Magnetic sweep for nails every day
- Final walkthrough before final payment
When to call us
- Roof 20–25+ years old
- Multiple leaks in different areas
- Sagging or soft spots
- Widespread curling, cracking or granule loss

Roof replacement: questions & answers
Straight answers from the people who do the work.
Do you work with insurance claims?
Yes. We document storm or wind damage with photos and measurements and provide the detailed scope your adjuster needs.
Can you help with HOA approval?
Yes. We provide material samples and color specs formatted for architectural review, and we’ve worked through HOA processes across the Peninsula.
What warranties come with a new roof?
Manufacturer material warranties (with enhanced coverage available on qualifying full-system installs) plus Skyline’s written 10-year workmanship warranty.
Read before you decide
Roofing · 2 min read
Repair or replace? What your roof really needs
Many leaking roofs need a repair, not a replacement. The signs that point each way, what a replacement includes, and how to spot an upsell.
Roofing · 2 min read
What a professional roof inspection should cover
A roof inspection is more than a look from the ladder. The Bay Area checklist we follow, what the report should include, and when to schedule one.
Roofing · 2 min read
Gutters and guards sized for Bay Area storms
Atmospheric rivers, hillside lots and tree cover make gutters matter here. How to size, pitch and protect a system that keeps water away from the building.
Let’s keep the water out — for good.
Tell us what’s going on. We’ll inspect, explain what we find with photos, and give you a written, fixed-price proposal — usually within 48 hours of the visit.