Skip to content
Roofing

Premium roofing, installed as a complete system.

Shingle, tile, metal and flat roofs for Bay Area homes and buildings — with honest, repair-first advice, every layer installed to the manufacturer’s instructions, and a written 10-year workmanship warranty on replacements.

And because we’re waterproofers too, the roof-to-deck and roof-to-wall transitions get the attention they deserve.

Skyline crew installing a new shingle roof in San Francisco.
The Skyline Standard

The details most roofers skip.

Full tear-offs, all-new metal, manufacturer fastening and balanced ventilation — the difference between a roof that lasts 15 years and one that lasts 30.

Read the full standard

01

Before we install

A good roof starts with an honest assessment and a complete scope.

  • Get on the roof — and in the attic
  • Repair first when repair is right
  • Written, fixed-price scopes
  • Permits and code compliance

02

While we install

Roofing is a system. The shingles are the part you see; the rest is what keeps water out.

  • Full tear-off to the deck
  • New metal at every detail
  • Manufacturer-spec fastening
  • Balanced ventilation
  • Protect the property

03

Before we call it done

You get a walkthrough, a warranty and a record of the work.

  • Final walkthrough
  • Warranty registration
  • Photo documentation

Skyline Roofing delivered a great result on our Wonder Years School project: proactive communication, zero surprises, and a flawless roof handed over on schedule.

David Brown

Tolo Construction

How it works

A clear process, start to finish.

  1. 01

    Free inspection

    On the roof and in the attic, with photos of everything we find.

  2. 02

    Written estimate

    Fixed price, detailed scope and options within 48 hours.

  3. 03

    Permits & install

    Permit pulled, crew scheduled, roof installed to manufacturer spec.

  4. 04

    Walkthrough & warranty

    Cleanup, final walkthrough and warranty paperwork.

FAQ

Roofing questions

Should I repair or replace my roof?

If the roof is mostly sound and the problem is a failed detail, repair it. If leaks are widespread, the deck is soft or the roofing is at the end of its life, replacement is the better investment. We show you photos and tell you which — honestly.

How long does a roof replacement take?

Most single-family homes take 1–3 days of active work once the permit is issued. Larger or more complex roofs take longer.

Which roofing manufacturers do you install?

For shingle roofs we install GAF and Owens Corning systems. For low-slope roofs we install TPO, PVC and modified bitumen systems from established manufacturers, and fleece-reinforced liquid membranes from Kemper System.

Do you pull permits?

Yes. Every replacement is permitted and inspected by the city, and we handle Title 24 cool-roof requirements where they apply.

What warranty do I get?

Manufacturer material warranties, with enhanced coverage available on qualifying full-system installs, plus Skyline’s written 10-year workmanship warranty on replacements.

Free assessment

Get an honest assessment of your roof.

Tell us what’s going on. We’ll inspect, explain what we find with photos, and give you a written, fixed-price proposal — usually within 48 hours of the visit.