Cool roofs & solar-ready roofing
California’s Title 24 energy code requires cool-roof products on many reroofs, depending on building type, roof slope, climate zone and how much of the roof is replaced. We handle the requirement and the paperwork.
If solar is in your future, a new roof is the moment to plan for it. We coordinate attachment zones, walkways and conduit routes with your solar provider so the array goes on without compromising the roof or its warranty.

- Reroofs that trigger Title 24
- Homes planning solar
- Commercial low-slope roofs
- Buildings with hot top floors
Done right the first time — and built to last.
Code handled
We identify when cool-roof rules apply and specify CRRC-rated products.
Solar-ready layouts
Attachment zones, setbacks and conduit paths planned before panels arrive.
Cooler buildings
Reflective roofs reduce heat gain on sunny days, even in foggy microclimates.
Warranty-safe solar
Details documented so your solar installer can protect the new roof.
Our process
01
Assess
Roof, structure, drainage and solar plans reviewed; Title 24 triggers flagged.
02
Specify
Cool-roof assemblies and accessories compatible with your solar layout.
03
Permit
Roofing scope, product data and energy-code forms for the building department.
04
Install and hand off
Roof installed with layout notes for your solar contractor.
What we check on every job
- CRRC-rated products where Title 24 requires them
- Solar attachments flashed into the roof system
- Roof made watertight before panels go on

Cool roofs & solar-ready: questions & answers
Straight answers from the people who do the work.
Do I need a cool roof?
It depends. For nonresidential low-slope roofs, replacing more than half the roof (or 2,000 sq ft, whichever is less) typically triggers the requirement statewide; for homes it depends on climate zone and roof slope. We check your address and scope.
Will adding solar later void my roof warranty?
Not if attachments are installed and flashed per the manufacturers’ requirements. We document attachment zones to make that easy.
Read before you decide
Roofing · 3 min read
Title 24 cool roofs and solar-ready roofing
When California’s energy code requires a cool roof, what “cool” means, how Bay Area climate zones change it, and how to plan a roof around future solar.
Roofing · 2 min read
What a professional roof inspection should cover
A roof inspection is more than a look from the ladder. The Bay Area checklist we follow, what the report should include, and when to schedule one.
Roofing · 2 min read
Gutters and guards sized for Bay Area storms
Atmospheric rivers, hillside lots and tree cover make gutters matter here. How to size, pitch and protect a system that keeps water away from the building.
Let’s keep the water out — for good.
Tell us what’s going on. We’ll inspect, explain what we find with photos, and give you a written, fixed-price proposal — usually within 48 hours of the visit.