Skip to content

Waterproofing · 3 min read

SB 721 and SB 326 balcony laws for Bay Area owners

Both first-round balcony inspection deadlines have passed. What SB 721 (apartments) and SB 326 (condos and HOAs) require, and how waterproofing fits the repair.

By The Skyline team ·

After the 2015 Berkeley balcony collapse, California passed two laws requiring periodic inspection of wood-framed balconies, decks and walkways on multifamily buildings: SB 721 for apartment buildings and SB 326 for condominium associations. Both laws are now well into their first cycle, and many Bay Area owners are moving from “get inspected” to “get it fixed.”

This guide summarizes what each law requires and where waterproofing comes in. It’s general information, not legal advice — your inspector, attorney and local building department have the final word on your building.

The short version

FeatureSB 721 (apartments)SB 326 (condos & HOAs)
LawHealth & Safety Code §17973Civil Code §5551
Applies toBuildings with 3 or more multifamily unitsCondominium associations responsible for the elements
First inspection dueJanuary 1, 2026 (extended from 2025 by AB 2579)January 1, 2025
How often after thatEvery 6 yearsAt least every 9 years
Who may inspectLicensed architect; civil or structural engineer; A, B or C-5 contractor with 5 years’ multistory wood-frame experience; certified building inspectorLicensed architect, structural engineer or civil engineer
SampleAt least 15% of each type of elementA random, statistically significant sample

Both first-round deadlines have passed. If your building hasn’t been inspected, talk to a qualified inspector now.

What counts as an “exterior elevated element”

Both laws focus on the same kind of structure: balconies, decks, porches, stairways, walkways and entry structures that extend beyond the building’s exterior walls, have a walking surface more than six feet above the ground, and rely in whole or in substantial part on wood or wood-based products for support.

SB 326 is explicit that the inspection covers the load-bearing components and their associated waterproofing system. That’s the point: wood framing rarely fails on its own. It fails because water got in and stayed in — through a cracked deck coating, an unflashed door threshold or a railing post set straight through the membrane.

What happens after the inspection

Under SB 721, the inspector’s report sorts findings by urgency:

  • Immediate threats to safety. The inspector notifies the owner and the local enforcement agency within 15 days, and the owner must take preventive measures right away — including keeping occupants off the element until repairs are approved.
  • Non-emergency repairs. The owner must apply for a permit within 120 days of receiving the report, then complete the repairs within 120 days of the permit being approved, unless the agency grants more time.

SB 326 follows a similar logic for associations, with immediate-threat findings reported to the association and to local code enforcement.

The repair itself has to follow the inspector’s recommendations, the manufacturer’s specifications, the California Building Standards Code and local requirements — with a permit. That manufacturer clause matters for waterproofing: a deck coating installed off-spec doesn’t just void a warranty, it can fall short of what the law asks for.

Who does what

A C-39 roofing and waterproofing contractor like Skyline is not one of the license types SB 721 lists for inspectors, and no contractor may perform SB 326 inspections. We don’t inspect — we repair and re-waterproof what the inspection finds, working from your inspector’s or engineer’s report.

Why the waterproofing is the repair that matters

When an inspector calls out damaged framing, the visible repair is replacing joists, ledgers or sheathing. The repair that keeps it from happening again is the waterproofing over it. On most Bay Area balconies, that means:

  1. Opening up enough to see the damage. Moisture readings and exploratory openings show how far rot extends.
  2. Repairing the structure to the engineer’s or inspector’s scope.
  3. Building slope back in so water leaves the deck instead of sitting on it.
  4. Flashing the details first: door pans, wall transitions, posts and edges.
  5. Installing a complete manufacturer system — for example a urethane walking-deck system, or a fleece-reinforced liquid membrane where tile or pavers go on top.
  6. Testing before finishing. Where the assembly allows, a flood test confirms the membrane is watertight before the final wear course and top coat.

Pedestrian deck coating over plywood

Pedestrian deck coating over plywood: 1. Plywood deck, sloped to drain, 2. Sheet-metal flashings, 3. Joint & detail reinforcement, 4. Primer, 5. Elastomeric base coat, 6. Wear coat + broadcast aggregate, 7. UV-stable top coat

Practical advice for owners and boards

  • Get the inspection report into your contractor’s hands early. The repair scope should map line by line to the findings.
  • Ask what system will be installed, by name. “Deck coating” isn’t a specification. The manufacturer, product and thickness should be in the proposal.
  • Ask whether the contractor is approved by that manufacturer. Many manufacturers only warranty systems installed by applicators they’ve trained.
  • Plan for the next cycle. Six or nine years goes quickly. A maintained, re-top-coated deck is far cheaper than another round of framing repairs.
  • Keep the paperwork. Permits, product data, thickness readings, test results and warranties make the next inspection — and any future sale — easier.

If you have an SB 721 or SB 326 report and need a contractor to carry out the repairs, send it to us. We’ll walk the elements, explain the scope and give you a fixed-price proposal for the repair and waterproofing.

Talk to someone who’s been on the roof.

Free assessments across the Bay Area. Written, fixed-price proposals.

Request an assessmentor call (415) 209-5199
Free assessment

Let’s keep the water out — for good.

Tell us what’s going on. We’ll inspect, explain what we find with photos, and give you a written, fixed-price proposal — usually within 48 hours of the visit.